06/16/2026
*Sound On* for the joy we are feeling as we break ground on a new storage, wash, and pack building. I’ve known we’d build this since the moment we started building our previous, DIY wash/pack/cooler building back in 2018. To be real, there were many a day between then and now where it didn’t feel possible. But today felt surreal, a huge step forward - after so much work the last 3 years to make this new building a reality. We’re ready for an upgrade -ready to level up from packing 100s of online orders in a shipping container, cramming up to 10 people in the small wash/pack room whilst 400+ CSAs and over 100,000 lbs of storage stream in and out of the coolers, ready to not have to freeze our buns off when shuttling food and supplies between buildings, ready to not cram over 40 macro bins of winter squash into tight shipping container quarters. And bonus, per Max’s persistence, this building is heated with a geothermal system 💋⚡️We are so ready 🪩✨